A new U.S. manufacturing hub for medium and large power transformers, planned in Gaffney, South Carolina.

Built for the next
generation of power

Built for the next
generation
of power

Detailed project data

The manufacturing facility project made to supply dependable infrastructure modernization and data centers with a medium and large power transformers — supporting utilities, generation, balance, grid infrastructure and major energy projects.

The planned facility combines transformer engineering, manufacturing, assembly and full-scale testing in one industrial location.

The manufacturing facility project made to supply infrastructure, data centers and overall grid expansion with a medium and large power transformers — supporting utilities, generation, balance, grid infrastructure and major energy projects.

The planned facility combines transformer engineering, manufacturing, assembly and full-scale testing in one industrial location.

100

Transformers
/ year*

Phase 1 nameplate capacity

$330M

Phase 1 capital requirement

>10,000 MVA

Planned manufacturing capacity

10,000

MVA

>

LIMIK FACTORY

MARKET DEMAND

Powering
the Southeast

Nearly $1 trillion is expected to be invested in the U.S. grid over the coming decade. As power demand, data centers and domestic manufacturing expand, transformer capacity becomes a critical part of the infrastructure required to deliver that growth.

Manufacturing closer to customers could also lower delivery-related costs and emissions.

Transformer factory

GAFFNEY, SOUTH CAROLINA

The planned facility will transform an existing industrial site into a dedicated manufacturing environment for medium and large power transformers.

$205M

Acquisition + renovation budget

150,000

sq.ft

Area planned for reconstruction

350+

New jobs by 2029

Designed
for ultra-high loads

Preliminary design completed

Factory reconstruction simulated

From existing facility to operational transformer plant — factory reconstruction has been pre-engineered and simulated as a complete construction sequence before physical work starts.

Preliminary construction decisions are developed, coordinated and visualized in advance — reducing uncertainty during execution.

equipment readiness

Heavy-transformer manufacturing environment

From core steel to final high-voltage testing — one integrated production environment built around medium and large power transformers with equipment selected to support project-specific transformer designs.

From core steel to final high-voltage testing — one integrated production environment built with an equipment selected to support project-specific transformer designs.

The total production-equipment investment plan including the test lab is about $113M at Phase 1.

The total production-equipment investment plan including the test lab is about $113M at Phase 1.

From core steel to final high-voltage testing — one integrated production environment built with an equipment selected to support project-specific transformer designs.

The total production-equipment investment plan including the test lab is about $113M at Phase 1.

Up to

600 MVA

Maximum transformer capacity

Up to

525 kV

Voltage class

In-house Testing

In-house
Testing

Integrated high-voltage testing lab

Product line

Custom-engineered from 20 to 600 MVA — configure voltage, cooling, regulation and project requirements.

Representative configurations.
Every LIMIK transformer will be engineered due to project specifications.

Representative configurations.
Every LIMIK transformer will be engineered due to project specifications.

  • LTZ-600

    600 MVA

    Planned 2029

    Extra-high-voltage flagship

    525 / 69 kV
    3-phase · OLTC
    ODAF / staged cooling

  • LTX-300

    300 MVA

    Planned 2029

    Large transmission transformer

    345 / 69 kV
    3-phase · OLTC
    ONAF / OFAF

  • LTZ-600

    600 MVA

    Planned 2029

    Extra-high-voltage flagship

    525 / 69 kV
    3-phase · OLTC
    ODAF / staged cooling

  • LTX-300

    300 MVA

    Planned 2029

    Large transmission transformer

    345 / 69 kV
    3-phase · OLTC
    ONAF / OFAF

LTZ-600

600 MVA

Planned 2029

Extra-high-voltage flagship

525 / 69 kV
3-phase · OLTC
ODAF / staged cooling

LTX-300

300 MVA

Planned 2029

Large transmission transformer

345 / 69 kV
3-phase · OLTC
ONAF / OFAF

LTX-300

300 MVA

Planned 2029

Large transmission transformer

345 / 69 kV
3-phase · OLTC
ONAF / OFAF

LTX-300

300 MVA

Planned 2029

Large transmission transformer

345 / 69 kV
3-phase · OLTC
ONAF / OFAF

Milestones:

2025

Foundation & Resource Acquisition

Group I: Infrastructure & Construction

Land & Utilities: Purchase of land, zoning modifications, and establishing utility connections (electricity and gas).

Engineering & Design: Development of the comprehensive factory construction project and technical documentation.

General Contractor: Selection and appointment of the general contractor (General Contractor / EPC) to oversee construction.

Equipment Procurement:
Pre- ordering long-lead equipment (Winding lines, Vacuum furnaces) with 12-18 month delivery times.

2026

Foundation & Resource Acquisition

Group 2: Core Operatims
g Commercial Launch

Intellectual Core: Recruitment of the team to begin transformer design based on specific technical requirements.

Market Validation: Front-end sales to secure advance orders and deposits. validating market demand for banking partners.

Chain Hedging: Strategic price hedging through advance payments for critical raw materials (copper and electrical steel).

Legal & Stabilization: Full legalization of operations, financial and formation of the management

2027-2028

Construction & Scaling

Physical project preparation.
Infrastructure & Technical Readiness

• Factory Construction
• Equipment & Installation
• Testing Validation
• Certification 8 permits
• Team Formation & Resource Management
• Technical Recruitment
• Workforce Training Strategic procurement
• Supply Chain Prep

2029

Grand Opening Launch

Objective: Transition from Construction to production operations

Fulfilment of 2026 advance orders With serial transformer production.

Market entry With comprehensive "We're Open" marketing campaign Rigorous quality control on initial production units to establish brand reputation

Customer relationship management and feedback integration

2030-2035

Foundation & Resource Acquisition

Objective: Achievement ot planned profitability benchmarks

Gradual capacity increase from Single Shift to three-shift operations

Economies Of scale through bulk raw material procurement

Full production capacity achievement within 4-5 years

Target profitability metrics realisation

Numbers:

project status

Phase 1:
$330M

Phase 1: $330M

Phase 1:
$330M

Total capital requirement

project status

$150M

Immediate financing milestone
to start reconstruction

$150M

Immediate financing milestone
to start reconstruction

$80M

Building acquisition

$30M

Initial renovation

$40M

Long-lead equipment deposits

Project readiness:

Site:

PCA executed

Plant design:

Preliminary plant design developed

Plant construction:

Construction process simulated, GC selection in final stage

Production equipment:

Critical suppliers and quotations identified

Customers:

LOI + active commercial pipeline

Customers:

Phase 1 capital formation underway

Commercial vision

Built for the next
generation
of power

LIMIK is building a customer pipeline across utilities, data centers, industrial power users, federal infrastructure, and public-power entities — in a market where transformer availability has become a critical constraint.

44

Identified commercial opportunities

Across utility, data-center, industrial and government-related markets.

40+

Utility & public-power target accounts

Including major U.S. utilities and transmission organizations with supplier-entry pathways identified.

Up to

80

Current non-binding LOI opportunity

Five-year potential supply program for approximately 50/63 MVA transformers serving data-center power infrastructure.

3-4

years

Lead time for some large transformers

DOE says large substation and generator transformers can now require three to four years, reinforcing the need for additional domestic manufacturing capacity.

Illustrative Commercial Pipeline:

2028:

$203M

2029:

$220M

2030:

$410M

Unweighted opportunity pipeline based on identified prospects.
Not contracted revenue.

target markets:

Utilities & Public Power:

Transmission expansion, replacement and substation projects

Data Centers:

Grid interconnection and behind-the-meter infrastructure

target markets:

Federal & Critical Infrastructure:

Grid resilience and mission-critical applications

EPC, Energy, Industry

Project-specific transformer procurement

Experience behind
the execution

We are the team of entrepreneurs and lead specialists with experience in transformer engineering, international manufacturing, logistics and development.

Igor Lon

Founder

Energy and infrastructure executive with 20+ years of experience across industrial projects, transformer substations and manufacturing facilities. Holds a PhD and MBA and leads LIMIK’s strategic development, investment structure, partnerships and project execution.

Daria Lon

Co-founder

Operations and organizational leader with extensive experience managing cross-functional teams in global corporations including Kraft Foods and Mondelēz International. Leads LIMIK’s business model, KPI framework, operational structure, workforce development and stakeholder coordination.

Alex Klimov

CTO

Power engineering specialist with 15+ years of experience in energy infrastructure, electrical systems and high-voltage substations. Has led technical departments and teams of up to 200 people, managing maintenance, modernization and greenfield energy projects through commissioning.

Nicolay Korch

Engineering lead

High-voltage transformer engineer with a career spanning research, testing, transformer manufacturing and experimental production. Progressed from high-voltage research and insulation laboratories to senior engineering and production leadership, including Chief Engineer roles in transformer-focused organizations.

STRATEGIC VISION

U.S. Grid &
Industrial Resilience

U.S. Grid &
Industrial
Resilience

  • Domestic transformer manufacturing

  • 352 planned jobs

  • South Carolina investment

  • Supply-chain development

  • Critical-infrastructure capability

Long-term investment in manufacturing, energy, and infrastructure is creating new capacity, stronger supply chains, and a more resilient foundation for industrial growth across the United States.

THE NEXT STEP

Together we build
what the grid needs

Together
we build
what the grid needs

Connect with the LIMIK team to discuss the manufacturing project,
transformer requirements, commercial opportunities or investment participation.

Investor Q&A

VIEW