Powering
the great
future
A new U.S. manufacturing hub for medium and large power transformers, planned in Gaffney, South Carolina.

Built for the next generation of power
LIMIK is developing a U.S. manufacturing facility for medium and large power transformers — supporting utilities, generation, grid
infrastructure and major energy projects.
The planned facility combines transformer engineering, manufacturing, assembly and full-scale testing in one industrial location.
100
Transformers
/ year*
Planned nameplate capacity.
$330M
Phase 1 model
>10,000 MVA
Planned annual capacity*
Powering
the Southeast
LIMIK’s planned factory in Gaffney, South Carolina, would serve the Southeast’s utilities, data centers and industrial projects. Regional production offers opportunities to create skilled jobs, strengthen domestic supply chains and reduce long-distance transport costs.
Manufacturing closer to customers could also lower delivery-related costs and emissions, while supplying the transformers needed for grid modernization and industrial electrification.

Transformer factory
The planned facility will transform an existing industrial site into a dedicated manufacturing environment for medium and large power transformers.
The project team is coordinating with economic development authorities on available incentives and support.
$79.2M
Indicative incentive package
150,000 sq ft
Planned high-bay production area
Full-scale testing
Integrated into the manufacturing process






Planned product line
Custom-engineered from 20 to 600 MVA — configure voltage, cooling, regulation and project requirements.
Representative configurations.
Every LIMIK transformer will be engineered due to project specifications.
LTZ-600
600 MVA
525 / 69 kV
3-phase · OLTC
ODAF / staged coolingExtra-high-voltage flagship
LTX-300
300 MVA
345 / 69 kV
3-phase · OLTC
ONAF / OFAFLarge transmission transformer
LTZ-600
600 MVA
525 / 69 kV
3-phase · OLTC
ODAF / staged coolingExtra-high-voltage flagship
LTX-300
300 MVA
345 / 69 kV
3-phase · OLTC
ONAF / OFAFLarge transmission transformer
Project milestones:
2025
Foundation & Resource Acquisition
Group I: Infrastructure & Construction
Land & Utilities: Purchase of land, zoning modifications, and establishing utility connections (electricity and gas).
Engineering & Design: Development of the comprehensive factory construction project and technical documentation.
General Contractor: Selection and appointment of the general contractor (General Contractor / EPC) to oversee construction.
Equipment Procurement:
Pre- ordering long-lead equipment (Winding lines, Vacuum furnaces) with 12-18 month delivery times.
2026
Foundation & Resource Acquisition
Group 2: Core Operatims
g Commercial Launch
Intellectual Core: Recruitment of the team to begin transformer design based On specific technical requirements. Market
Validation: Front-end sales to secure advance orders and deposits. validating market demand for banking partners.
Chain Hedging: Strategic price hedging through advance payments for critical raw materials (copper and electrical steel).
Legal & Stabilization: Full legalization of operations, financial and formation of the management
2027-2028
Construction & Scaling
Physical project imolementation and workforce preparation
Infrastructure & Technical Readiness:
• Factory Construction
• Equipment & Installation
• Testing Validation
• Certification 8 permits
• Team Formation & Resource Management
• Technical Recruitment
• Workforce Training Strategic procurement
• Supply Chain Prep
2029
Grand Opening Launch
Objective: Transition from Construction to production operations
Fulfilment of 2026 advance orders With serial transformer production.
Market entry With comprehensive "We're Open" marketing campaign Rigorous quality control on initial production units to establish brand reputation
Customer relationship management and feedback integration
2030-2035
Foundation & Resource Acquisition
Objective: Achievement ot planned profitability benchmarks
Gradual capacity increase from Single Shift to three-shift operations
Economies Of scale through bulk raw material procurement
Full production capacity achievement within 4-5 years
Target profitability metrics realisation
Experience behind
the execution
We are the team of entrepreneurs and lead specialists with experience in transformer engineering, international manufacturing, logistics and development.

Igor Lon
Founder
Energy and infrastructure executive with 20+ years of experience across industrial projects, transformer substations and manufacturing facilities. Holds a PhD and MBA and leads LIMIK’s strategic development, investment structure, partnerships and project execution.

Daria Lon
Co-founder
Operations and organizational leader with extensive experience managing cross-functional teams in global corporations including Kraft Foods and Mondelēz International. Leads LIMIK’s business model, KPI framework, operational structure, workforce development and stakeholder coordination.

Alex Klimov
CTO
Power engineering specialist with 15+ years of experience in energy infrastructure, electrical systems and high-voltage substations. Has led technical departments and teams of up to 200 people, managing maintenance, modernization and greenfield energy projects through commissioning.

Nicolay Korch
Engineering lead
High-voltage transformer engineer with a career spanning research, testing, transformer manufacturing and experimental production. Progressed from high-voltage research and insulation laboratories to senior engineering and production leadership, including Chief Engineer roles in transformer-focused organizations.
THE NEXT STEP
Together we build
what the grid needs
Connect with the LIMIK team to discuss the manufacturing project,
transformer requirements, commercial opportunities or investment participation.
Investor Q&A